Free Engineering Tool

Tunnel Ventilation Assessment

Estimate the ventilation requirement from manpower, diesel equipment and return-air velocity criteria, then compare the result with measured airflow at site.

Application demonstration

See the engineering workflow in under 30 seconds.

Watch how field inputs are converted into required airflow, actual airflow, adequacy and shortfall or surplus for rapid ventilation screening.

The engineering question

Is the airflow actually available at the working face adequate for the manpower, diesel equipment and minimum return-air velocity requirements applicable to the tunnel condition?

Inputs

  • Tunnel cross-sectional area
  • Persons working underground
  • Diesel equipment brake horsepower
  • Methane-risk condition
  • Measured return-air velocity, where available

What the application calculates

  • Air requirement for personnel
  • Air requirement for diesel equipment
  • Air requirement from return-air velocity criteria
  • Controlling design airflow
  • Required fan delivery after duct efficiency
  • Actual airflow from measured velocity × area
  • Adequacy percentage and shortfall / surplus
Screening tool, not a substitute for the project ventilation planSite-specific statutory requirements, ventilation layout, leakage, duct condition, auxiliary fans, contaminants, blasting fumes, gas risk and emergency arrangements must be assessed separately by competent persons.