The engineering question
Can the available batching, transport, placing and compaction resources achieve the required pour rate while maintaining concrete-quality and placement constraints—or will one resource control the operation while others remain underutilised?
What the tool tests
- Required pour rate and pour duration
- Batching-plant production capacity
- Transport fleet capacity, fleet size and cycle time
- Placing / pumping capacity
- Compaction capacity and layer-thickness constraint
- Controlling resource across the full production chain
- Resource utilisation, shortfall and under-utilised capacity
- Alternative resource combinations before the pour plan is frozen
Engineering purposeThe application tests the entire batching → transport → placing → compaction chain so that the controlling resource, utilisation imbalance and practical corrective options are visible before the pour plan is finalised.